ϟ PUBLIC CHARGING

Shell Recharge NL Fluitekruid 14

Ubitricity · Fluitekruid 14 1391 TJ Abcoude · Netherlands

Directions with Google Maps ↗

Opens an external route planner. The map position may not be the vehicle entrance. Check access with a trailer separately.

Charging equipment

Reported connector status is shown only when its timestamp is no more than 30 minutes old. Unknown means we have no fresh usable status.

ConnectorMaximum powerReported status
CCS175 kWAvailable19 Sep 2026 14:28 UTC
CCS175 kWOffline19 Sep 2026 14:28 UTC
CCS175 kWAvailable19 Sep 2026 14:28 UTC
CCS175 kWOffline19 Sep 2026 14:28 UTC
CCS90 kWAvailable19 Sep 2026 14:28 UTC
CCS90 kWAvailable19 Sep 2026 14:28 UTC
CHAdeMO62.5 kWAvailable19 Sep 2026 14:28 UTC
CHAdeMO62.5 kWOffline19 Sep 2026 14:28 UTC
CHAdeMO62.5 kWAvailable19 Sep 2026 14:28 UTC
CHAdeMO62.5 kWOffline19 Sep 2026 14:28 UTC
Type222 kWIn use19 Sep 2026 14:23 UTC
Type222 kWAvailable19 Sep 2026 14:23 UTC

Check before you connect

Current tariffs, payment methods and overnight parking rules are not confirmed here. Check the provider’s app or the instructions at the charger. A public charger does not provide permission to camp or stay overnight.

Inventory source: ndw_ocpi · Data & methodology

See the places on a map

Load OpenStreetMap to see these same results. Map tiles connect to an external provider.

Place On-site charging confirmed Separate public charger